Central Sphere Minimum Wage w.e.f April 1, 2018 to September 30, 2018

Revised Minimum Wage in Central Sphere. Get to know latest minimum wage in Delhi, Gujarat, Chattisgarh, Tripura, West Bengal at www.paycheck.in
Sr No Scheduled Employment Area Category of workers
Un-Skilled Semi-Skilled/Unskilled Supervisory Skilled/Clerical Highly Skilled Clerical
Basic Min Wage V.D.A. Total Min Wage Basic Min Wage V.D.A. Total Min Wage Basic Min Wage V.D.A. Total Min Wage Basic Min Wage V.D.A. Total Min Wage Basic Min Wage V.D.A. Total Min Wage
( In Rupees Per Day ) ( In Rupees Per Day ) ( In Rupees Per Day ) ( In Rupees Per Day ) ( In Rupees Per Day )
1 Agriculture A 333 19 352 364 21 385 395 23 418 438 25 463 395 23 418
B 303 18 321 335 19 343 364 21 385 407 23 430 364 21 385
C 300 18 318 307 18 325 334 19 353 364 21 385 334 19 353
2 Industrial Worker (employees employed in loading and unloading in 1)goods sheda, parcel offices of railways; 2) other goodssheds, godowns, warehouses; 3) docks and ports A 523 30 553
B 437 25 462 0
C 350 20 370 0
3 Industrial Workers employed in Gypsum Mines, Barytes Mines, Mauxite Mines, Manganese Mines, China Clay Mines, Kyanite Mines, Copper Mines, Clay Mines, Magnesite Mines, White Clay Mines, Stone Mines, Steatite Mines, Ochre Mines, Asbestos Mines, Fire Clay Mines, Chromite Mines, Quartzite Mines, Quartz Mines, Silica Mines, Graphite Mines, Felspar Mines, Laterite Mines, Dolomite Mines, Red Oxide Mines, Wolfram Mines, Iron Ore Mines, Granite Mines, Rock Phosphate Mines, Hematite Mines, Marble and Calcite Mines, Uranium Mines, Mica Mines, Lignite Mines, Gravel Mines, Slate Mines, Magnetite Mine For work above ground 350 20 359 437 25 462 523 30 553 610 35 645
For work below ground 437 25 462 523 30 553 610 35 645 683 39 722
4 Sweeping and Cleaning A 523 30 553
B 437 25 462
C 350 20 370
5 Watch and Ward (without arms) A 637 36 673
B 579 33 612
C 494 28 522
6 Watch and Ward (with arms) A 693 39 732
B 637 36 673
C 579 33 612
7 Construction or maintenance of roads or runways in buliding operations including laying down underground electric,wireless, radio, television, telephone, telegraph and overseas communication cables and similar other underground cabling work, electric lines, water supply lines and sewerage pipe lines A 523 30 553 579 33 612 637 36 673 639 39 678 637 36 673
B 437 25 462 494 28 522 579 33 612 637 36 673 579 33 612
C 350 20 370 410 23 433 494 28 522 579 33 612 494 28 522

Category Daily Basic Wage Daily VDA Total Daily Minimum Wages
1. Excavation & removal of over burden with 50 m lead/1.5 meters lift
(a) Soft Soil 351 21 372
(b) Soft Soil with Rock 531 30 561
(c ) Rock 703 40 743
2.  Removal and Staking of rejected stones with 50 meters lead 1.5 meters lift 283 16 299
Stone Breaking or Stone Crushing for the stone size Daily Basic Wage Daily VDA Total Daily Minimum Wages
(a) 1.0 inch to 1.5 inches 2171 122 2293
(b) Above 1.5 inches to 3.0 inches 1857 104 1961
(c ) Above 3.0 inches to 5.0 inches 1088 62 1150
(d) Above 5.0 inches 893 51 944
Loading...