Central Sphere Minimum Wage w.e.f October 1, 2017 to March 31, 2018

Revised Minimum Wage in Central Sphere. Find out latest minimum wage in Assam, Gujarat, Punjab, Chandigarh, Chattisgarh at www.paycheck.in
Scheduled Employment Area Category of workers
Un-Skilled Semi-Skilled/Unskilled Supervisory Skilled/Clerical Highly Skilled Clerical
Basic Min Wage V.D.A. Total Min Wage Basic Min Wage V.D.A. Total Min Wage Basic Min Wage V.D.A. Total Min Wage Basic Min Wage V.D.A. Total Min Wage Basic Min Wage V.D.A. Total Min Wage
( In Rupees Per Day ) ( In Rupees Per Day ) ( In Rupees Per Day ) ( In Rupees Per Day ) ( In Rupees Per Day )
Agriculture A 333 8 341 364 9 373 395 10 405 438 11 449 395 10 405
B 303 8 311 335 8 343 364 9 373 407 10 417 364 9 373
C 300 8 308 307 8 315 334 8 342 364 9 373 334 8 342
Industrial Worker (employees employed in loading and unloading in 1)goods sheda, parcel offices of railways; 2) other goodssheds, godowns, warehouses; 3) docks and ports A 523 13 536
B 437 11 448 0
C 350 9 359 0
Industrial Workers employed in Gypsum Mines, Barytes Mines, Mauxite Mines, Manganese Mines, China Clay Mines, Kyanite Mines, Copper Mines, Clay Mines, Magnesite Mines, White Clay Mines, Stone Mines, Steatite Mines, Ochre Mines, Asbestos Mines, Fire Clay Mines, Chromite Mines, Quartzite Mines, Quartz Mines, Silica Mines, Graphite Mines, Felspar Mines, Laterite Mines, Dolomite Mines, Red Oxide Mines, Wolfram Mines, Iron Ore Mines, Granite Mines, Rock Phosphate Mines, Hematite Mines, Marble and Calcite Mines, Uranium Mines, Mica Mines, Lignite Mines, Gravel Mines, Slate Mines, Magnetite Mine For work above ground 350 9 359 437 11 448 523 13 536 610 15 625
For work below ground 437 11 448 523 13 536 610 15 625 683 17 700
Sweeping and Cleaning A 523 13 536
B 437 11 448
C 350 9 359
Watch and Ward (without arms) A 637 16 653
B 579 14 593
C 494 12 506
Watch and Ward (with arms) A 693 17 710
B 637 16 653
C 579 14 593
Construction or maintenance of roads or runways in buliding operations including laying down underground electric,wireless, radio, television, telephone, telegraph and overseas communication cables and similar other underground cabling work, electric lines, water supply lines and sewerage pipe lines A 523 13 536 579 14 593 637 16 653 639 17 656 637 16 653
B 437 11 448 494 12 506 579 14 593 637 16 653 579 14 593
C 350 9 359 410 10 420 494 12 506 579 14 593 494 12 506
Workers engaged in Stone Mines for Stone Breaking and Stone Crushing Category Daily Basic Wage Daily VDA Total Daily Minimum Wages
1. Excavation & removal of over burden with 50 m lead/1.5 meters lift
(a) Soft Soil 351 9 360
(b) Soft Soil with Rock 531 13 544
(c ) Rock 703 17 720
2.  Removal and Staking of rejected stones with 50 meters lead 1.5 meters lift 283 7 290
Stone Breaking or Stone Crushing for the stone size Daily Basic Wage Daily VDA Total Daily Minimum Wages
(a) 1.0 inch to 1.5 inches 2171 53 2224
(b) Above 1.5 inches to 3.0 inches 1857 45 1902
(c ) Above 3.0 inches to 5.0 inches 1088 27 1115
(d) Above 5.0 inches 893 22 915
Loading...