Minimum Wage in Central Sphere w.e.f October 1, 2015 to March 31, 2016

Revised minimum wage in central sphere from October 1, 2015. Get latest wage rates for all Indian states in www.paycheck.in
Sr No Scheduled Employment Area Category of workers
Un-Skilled Semi-Skilled/Unskilled Supervisory Skilled/Clerical Highly Skilled
Basic Min Wage V.D.A. Total Min Wage Basic Min Wage V.D.A. Total Min Wage Basic Min Wage V.D.A. Total Min Wage Basic Min Wage V.D.A. Total Min Wage
( In Rupees Per Day ) ( In Rupees Per Day ) ( In Rupees Per Day ) ( In Rupees Per Day )
1 Agriculture A 114 112 226 125 122 247 137 132 269 153 145 298
B 104 102 206 116 112 228 125 122 247 141 135 276
C 102 102 204 107 102 209 115 112 227 125 122 247
2 Industrial Worker (employees employed in loading and unloading in 1)goods sheda, parcel offices of railways; 2) other goodssheds, godowns, warehouses; 3) docks and ports A 180 173 353
B 150 144 294 0
C 120 116 236 0
3 Industrial Workers employed in Gypsum Mines, Barytes Mines, Mauxite Mines, Manganese Mines, China Clay Mines, Kyanite Mines, Copper Mines, Clay Mines, Magnesite Mines, White Clay Mines, Stone Mines, Steatite Mines, Ochre Mines, Asbestos Mines, Fire Clay Mines, Chromite Mines, Quartzite Mines, Quartz Mines, Silica Mines, Graphite Mines, Felspar Mines, Laterite Mines, Dolomite Mines, Red Oxide Mines, Wolfram Mines, Iron Ore Mines, Granite Mines, Rock Phosphate Mines, Hematite Mines, Marble and Calcite Mines, Uranium Mines, Mica Mines, Lignite Mines, Gravel Mines, Slate Mines, Magnetite Mine For work above ground 120 116 236 150 144 294 180 173 353 210 201 411
For work below ground 150 144 294 180 173 353 210 201 411 240 227 467
4 Sweeping and Cleaning A 180 173 353
B 150 144 294
C 120 116 236
5 Watch and Ward (without arms) A 200 190 390
B 170 163 333
C 140 136 276
6 Watch and Ward (with arms) A 220 210 430
B 200 190 390
C 170 163 333
7 Construction or maintenance of roads or runways in buliding operations including laying down underground electric,wireless, radio, television, telephone, telegraph and overseas communication cables and similar other underground cabling work, electric lines, water supply lines and sewerage pipe lines A 180 173 353 200 190 390 220 210 430 240 227 467
B 150 144 294 170 163 333 200 190 390 220 210 430
C 120 116 236 140 136 276 170 163 333 200 190 390
8 Workers engaged in Stone Mines for Stone Breaking and Stone Crushing Category Daily Basic Wage Daily VDA Total Daily Minimum Wages
1. Excavation & removal of over burden with 50 m lead/1.5 meters lift
(a) Soft Soil 103.53 132 235.53
(b) Soft Soil with Rock 157.78 199 356.78
(c ) Rock 208.09 264 472.09
2.  Removal and Staking of rejected stones with 50 meters lead 1.5 meters lift 82.44 107 189.44
Stone Breaking or Stone Crushing for the stone size Daily Basic Wage Daily VDA Total Daily Minimum Wages
(a) 1.0 inch to 1.5 inches 646.44 818 1464.44
(b) Above 1.5 inches to 3.0 inches 552.12 700 1252.12
(c ) Above 3.0 inches to 5.0 inches 322.69 410 732.69
(d) Above 5.0 inches 264.47 337 601.47
Loading...