Minimum Wage in Central Sphere with effect from October 1, 2016 to March 31, 2017

Central Sphere Minimum Wage. Get to know latest minimum wage in India
Sr No Scheduled Employment Area Category of workers
Un-Skilled Semi-Skilled/Unskilled Supervisory Skilled/Clerical Highly Skilled
Basic Min Wage V.D.A. Total Min Wage Basic Min Wage V.D.A. Total Min Wage Basic Min Wage V.D.A. Total Min Wage Basic Min Wage V.D.A. Total Min Wage
( In Rupees Per Day ) ( In Rupees Per Day ) ( In Rupees Per Day ) ( In Rupees Per Day )
1 Agriculture A 114 123 237 125 134 259 137 144 281 153 159 312
B 104 112 216 116 123 239 125 134 259 141 148 289
C 102 112 214 107 112 219 115 123 238 125 134 259
2 Industrial Worker (employees employed in loading and unloading in 1)goods sheda, parcel offices of railways; 2) other goodssheds, godowns, warehouses; 3) docks and ports A 180 194 374
B 150 162 312 0
C 120 130 250 0
3 Industrial Workers employed in Gypsum Mines, Barytes Mines, Mauxite Mines, Manganese Mines, China Clay Mines, Kyanite Mines, Copper Mines, Clay Mines, Magnesite Mines, White Clay Mines, Stone Mines, Steatite Mines, Ochre Mines, Asbestos Mines, Fire Clay Mines, Chromite Mines, Quartzite Mines, Quartz Mines, Silica Mines, Graphite Mines, Felspar Mines, Laterite Mines, Dolomite Mines, Red Oxide Mines, Wolfram Mines, Iron Ore Mines, Granite Mines, Rock Phosphate Mines, Hematite Mines, Marble and Calcite Mines, Uranium Mines, Mica Mines, Lignite Mines, Gravel Mines, Slate Mines, Magnetite Mine For work above ground 120 130 250 150 162 312 180 194 374 210 226 436
For work below ground 150 162 312 180 194 368 210 226 436 240 255 495
4 Sweeping and Cleaning A 180 188 368
B 150 157 307
C 120 126 246
5 Watch and Ward (without arms) A 200 207 407
B 170 177 347
C 140 148 288
6 Watch and Ward (with arms) A 220 228 448
B 200 207 407
C 170 177 347
7 Construction or maintenance of roads or runways in buliding operations including laying down underground electric,wireless, radio, television, telephone, telegraph and overseas communication cables and similar other underground cabling work, electric lines, water supply lines and sewerage pipe lines A 180 194 374 200 214 414 220 236 456 240 255 495
B 150 162 312 170 183 353 200 214 414 220 236 456
C 120 130 250 140 153 293 170 183 353 200 214 414
Workers engaged in Stone Mines for Stone Breaking and Stone Crushing Category Daily Basic Wage Daily VDA Total Daily Minimum Wages
1. Excavation & removal of over burden with 50 m lead/1.5 meters lift
(a) Soft Soil 103.53 148 251.53
(b) Soft Soil with Rock 157.78 222 379.78
(c ) Rock 208.09 294 502.09
2.  Removal and Staking of rejected stones with 50 meters lead 1.5 meters lift 82.44 120 202.44
Stone Breaking or Stone Crushing for the stone size Daily Basic Wage Daily VDA Total Daily Minimum Wages
(a) 1.0 inch to 1.5 inches 646.44 906 1552.44
(b) Above 1.5 inches to 3.0 inches 552.12 776 1328.12
(c ) Above 3.0 inches to 5.0 inches 322.69 455 777.69
(d) Above 5.0 inches 264.47 374 638.47
Loading...